Categories
Uncategorized

a soggy summer is a green summer

it has not stopped raining. this is really pretty remarkable, all things considered. we’ve had over 7″ of rain on the farm so far in 2015, and no indication of the storm season slackening. happily, since the tree fell, we have had no further rain related disasters; just the usual run of weeds and mosquitoes. we need a native toad infusion, stat; there seem to be far fewer spadefoot toads than usual, and i think that there was a die-off over last winter.

there are of course billions of grasshoppers, as well as the mosquitoes. the garden is thriving around them, though some of the elms out back have leaves like tatwork.

20150613_162322

corn.
20150711_154158

an overview of the green
20150705_201055

we’re getting more interesting bugs, like this gorgeous mallow beetle.
20150627_110147

we also have a family of summer tanagers living in the cottonwoods. this is the female:
20150627_114259

and the brilliant male. i had to run for help to identify him; i couldn’t believe i was seeing a cardinal this far west. and sure enough, he’s not.
20150627_114557

and here is a fledgling tanager.
20150627_114254

incipient pomegranates
20150627_111000

20150707_074021

a lily in the aquaponics system
20150707_074128

the back field grew so tall so fast, and so thick with sunflowers, that we borrowed Robin’s sheep to help tame it. they’re doing a world of good, trampling in the buckwheat seeds and eating most of the weeds (though not quite as many of the sunflowers as i’d like).

20150711_155814

20150711_155808

20150711_154127

20150629_190250

meanwhile, the wall project is consuming all of my farm-time, and it’s chugging along quite well. we’ve got a great crew of people reliably coming down to help work on it, and all the available Stewards and interns have been putting their backs to it since we started in May. There are three segments to the wall addition, and two gates (the three bits are between teh gates). The gates are custom wood gates from Groff Lumber, and will be installed in mid-August. we’ve got the first section, which is the longest, fully built, and plan to spend August building the second segment — and helping our frieds at the Hive do repairs and some final construction on their earthbag wall! they’ve been coming down to help us out reliably all summer. My goal is to build the second segment in two workdays in August, and get it plastered by the end of September. we’ll build segment three in 2016; this is enough for one year.

here’s the wall a couple weeks ago, with some bad bags patched with duct tape (that’s the red):
20150710_135505

and the wall as of last week, with a full first-coat of plaster done. we’re aiming to complete a second coat this friday, and then will begin building the second segment in August.

and of course, a gratuitous kitty pic. i have it on good authority that the paw is the cutest part of the cat.
20150621_143045